menu click
Search

Major projects/contracts expected to go to market within 12 months

How to use these tables 

The list below can be filtered by entering a value into the column and clicking the funnel icon and selecting how you want the value applied.

Scroll to the right to see all the details.

You can also sort projects by date order (ascending or descending) by hovering over the 'Expected Date To Market' column heading. 

Results can be exported to Excel, Word, PDF or a CSV file by clicking on the icons below. If a filter is applied, the filtered results are exported.

Please Note: Quarters are Calendar Year

Last update: 24/4/17

StateProjectDescriptionContract TypeApprox Contract ValueExpected Date To MarketExpected Start WorksExpected Completion DateContact
Filter Filter FilterFilterFilterFilterFilter
         
NSWM1 Pacific Motorway Upgrade - Kariong to SomersbyWidening of the M1 Motorway from four to six lanes between the Kariong and Somersby interchanges (open to pre-qualified and shortlisted tenderers only)C Opened 12/4/17; closes 7/6/17   
NSWM4 Smart MotorwayConstruction of Package A (open to pre-qualifed and shortlisted tenderers only)C Opened 10/4/17; closes 19/5/17   
NSWEllerton Drive ExtensionConstruction of Ellerton Drive extension in Queanbeyan, including new six span bridge over Queanbeyan RiverC Opened 20/3/17; closes16/5/17   
NSWAlbion Park BypassDetailed design and construction of extension to the M1 between Yallah and Oak Flats, bypassing the Princes Hwy at Albion Park RailEoI Opened 17/3/17; closes 28/4/17   
VICStreamlining Hoddle Street Project - Stage 1 (Package A)Stage 1 (Package A) - design and construct road and bridgeworks on Hoddle St between the Eastern Fwy and Johnston StEoI Opened 19/4/17; closes 10/5/17   
VICDrysdale BypassDesign and construct a new 6 kilometre, two-way, two lane C class roadEoI Opened 29/3/17; closes 3/5/17   
QLDProject No: 212/10L/7 - Bruce Highway (Ayr - Townsville); Horseshoe Lagoon - Palm CreekConstruct bridge/s and approaches $400m2017 Qtr 220182021District Director - TMR ph (07) 4421 8848
VICMidland Highway - Bendigo to WhiteHillsOvertaking lanes  2017 Qtr 22017 Qtr 42019 Qtr 2 
QLDProject No:222/18D/2 - Warrego Hwy (Miles - Roma); Miles western access (0 - 1.77km)Duplicate from 2 to 4 lanes $15m2017 Qtr 320172019District Director - TMR ph (07) 4639 0777
QLDProject No: 228/162/2 - Pialba - Burrum Heads Road; Scrub Hill Road / Wide Bay Drive intersection (0.70 - 1.35km)Installation of traffic signals and reconfiguration to form 4-way intersection $15.62017 Qtr 320172018District Director - TMR ph (07) 4154 0200
QLDProject No: 279/16A/2 - Capricorn Highway (Rockhampton - Duaringa); (0.5 - 5.7km)Duplicate from 2 to 4 lanes $75m2017 Qtr 320182019District Director - TMR ph (07) 4931 1501

© Roads Australia 2017. Roads Australia does not warrant, guarantee or make any representations regarding the currency, accuracy, correctness, reliability, useability, or any other aspect, of the material presented on this Web site, nor of material provided by others to Roads Australia and presented on this Web site, nor of material provided by others and accessed from this site using links or connections to their Web sites or distribution services. The user accepts sole responsibility and all risk for using material presented on or accessed from this Web site. Roads Australia does not accept any liability for any loss or damage which may be incurred as a result of using this Web site or any material presented on or accessed from this Web site.